About Us
2035 Vision
Strategic Plan & Performance
Research
History
Milorganite
GIS Maps and Data
News
Events
Facilities
Budget/Financial
Blue Notes Newsletter
Blue Notes Newsletter Sign-up
What We Do
Education and Outreach
Milwaukee Estuary AOC Projects
Sustainability
What You Can Do
Green infrastructure
Rain Barrels
Rain Garden
Porous Pavement
Native Landscaping
Adopt-A-River
Become a Fresh Coast Guardian
Home HazMat Collection
Medicine Collections
Water Drop Alert
What Not to Flush
Procurement
Procurement Opportunities
Construction and CAD Standard Documents and Special Bid Attachments
Vendor Registration
Events & Outreach
Supplier Development
Business Capacity Development
Workforce Development
Contract Compliance Login
Government & Business
Municipal Information
Rules & Regulations
Private Property I & I
Pipe Check Contractor Resources
Industrial Waste & Pretreatment
Total Maximum Daily Loads (TMDL)
2050 Facilities Plan
2020 Water Quality Initiative
Share This
Through this note, I hope to answer questions and address incorrect information I have seen on social media about the deep tunnel system and the August 9-10th storm, and the timing of opening tunnel gates.
First, I am the person who has the responsibility of closing the gates to the deep tunnels. I am an engineer and I would NEVER purposefully cause basement backups in any of the 29 municipalities that drain to the Milwaukee Metropolitan Sewerage District’s (MMSD) sewer system. NEVER.
The municipal and MMSD sewer infrastructure is integrated throughout the region. There are 3,000 miles of privately owned laterals that connect to 3,000 miles of municipal-owned sewers. Those sewers connect to 300 miles of MMSD’s larger and deeper metropolitan intercepting sewers.
When I ask for the tunnel gates to be closed, we close all of them in two phases. I first close gates to try to stop overfilling the tunnel, and secondly, close tunnel gates when the tunnel is full. When the gates to the tunnel are closed, water is overflowed to the rivers. This sequence of tunnel gate closures is designed to help minimize the basement backups that might occur.
Additionally, the deep tunnel is not meant to control flooding. The tunnel was built to reduce sewage overflows to the rivers and Lake Michigan. Since the original tunnel came online, we have significantly reduced the number of overflows to the rivers, from 50-60 per year to an average of two.
So far in 2025, we have had one tunnel overflow in August. Yes, this was the largest overflow since the tunnel became operational, but it was also the largest storm, estimated at a 1000-year storm, since the tunnel became operational. There are no gates in our rivers or streams that control surface flooding.
On the evening of August 9th, the storm hit unexpectedly and inundated this region. The tunnel system started to fill quickly. By 9:55 pm we could see that the tunnel would overfill if we did not take some action, so we closed the first set of tunnel gates from the combined sewer system. This action stopped water from entering the tunnel from the area around downtown Milwaukee and part of Shorewood. When the tunnel gates close, the water flows by gravity to overflow points along the waterways.
During a normal storm, this would have been enough to stop the tunnel from overfilling. Unfortunately, after midnight on August 10th, a second round of heavy rainfall occurred. The tunnel continued to fill with water from all of the municipalities. We closed the second set of tunnel gates at 3:05 am.
At this point, the tunnel system was completely full; it would not matter if the gates were open or closed, no more water could get into the tunnel. During a storm, you can easily monitor this information by visiting MMSD’s website and going to the Live Rain and Facility Information page, which refreshes the data every 5 minutes; it is real-time.
The Milwaukee region got hit with a record storm. The tunnel filled up. The rivers filled up. The regional and local sewers filled up. Streets were flooded, and unfortunately, basements flooded. No infrastructure in the world would be able to manage this amount of rain. The devastation we experienced is unreal, and I feel for all who had damage to their homes.
I hope this helps, but if folks would like to talk further, please send me an email at kshafer@mmsd.com.
Kevin L. Shafer, P.E. Executive Director - Milwaukee Metropolitan Sewerage District
Join our Blue Notes email list to receive quarterly MMSD updates and news.
Sign up to receive news and information from Executive Director of MMSD Kevin Shafer's in his Blue Notes newsletter
Receive Water Drop Alert text messages when heavy rain threatens the area. When a Water Drop Alert has been issued, a reminder is sent to use less water.
What do you do when an alert is issued?
By using our website you are consenting to our use of cookies in accordance with our cookie policy.