Project Overview

With the increase of development and its demand on the sewer system and the repeated surcharging and separate sewer overflows (SSOs) in recent years, MMSD is undertaking a project to increase the capacity of the 72-inch sewer in the northeast section of MMSD’s service area. This system, the Metropolitan Interceptor System (MIS) sewers, collects wastewater flow from the municipal system and carries it to the water reclamation facility for treatment.

During wet weather, clear water from infiltration and inflow (I/I) finds its way into the system and overwhelms the MIS, causing conveyance capacity issues that increase the frequency of SSOs and increase the potential for basement backups. 

MMSD has two wastewater gravity overflow manholes located at West Green Tree Road at North River Road and the Milwaukee River along the 72-inch diameter MIS. The gravity overflow structure (BS0404) helps to protect the MIS from surcharging, over-flowing the pipe, and backing up into the municipal sanitary sewer system and potentially, causing basement backups. Since 2008, six wet weather events have caused significant surcharging in the MIS, enough to activate the overflow at BS0404.

MMSD will make the following improvements that will increase the capacity of the system and address surcharging and decrease the potential of overflows:

  • Two 6X10 foot structures to divert from ? to ?
  • 9,000 linear feet of 54-inch-diameter relief sewer that will serve as an overflow line
  • Construction of 10 – 15 manholes along the 2-mile stretch of pipe for maintenance access
  • Construction of a new drop-shaft to the Deep Tunnel

Project Map

Project Goals

  • Reduce the risk of sanitary sewer overflows
  • Reduce the risk of basement backups
  • Build greater capacity for the system’s 72-inch MIS from West Green Tree Road and North River Road to West Mill Road and North Sydney Place. 

Project Timeline*

  • Design – 2020 - 2028
  • Construction – 2030 -2033
  • Restoration – 2034 – 2035

*Project timeline is subject to change